Subscribe



Receive HTML?

Bonnie

VERSION CHANGE
08.01.08 Original version
09.09.09

Page 1 - Yarn quantities have been corrected and should read: "16 (18, 19, 21, 22, 24) balls of Mission Falls 1824 Wool...." 

Vivian

VERSION CHANGE
11.12.08 Original version
02.26.10

Page 3 - Column 1, row 128 should read: "* Work in pattern to marked st, p2tog tbl, work in pattern to 1 st before marked st, p2tog, rep from *, work in pattern to end."

Page 3 - Column 1, under Sizes 32-36 only, row 150 should read: "Sl 3, work 55 (56, 57, -, -, -, -, -, -, -) sts in pattern, omitting the cable twists on the Right Front Cable, turn. Proceed to right saddle section."

Page 3 - Column 3, paragraph 5 (before Left Saddle) should read: "Next row: Sl 1, work 14 sts in pattern, sssk, work 54 (56, 58, 64, 66, 68, 74, 76, 78, 80) sts in pattern, omitting the cable twists on the Large Cables on the back for sizes 32-36, turn."

3.26.10

Page 5 - Both Left and Right Front Cable Charts are one stitch too wide on 4 specific rows as follows:

Row 91: P2, k2, p2, k4, p2, k2, p2.
Row 92: P2, k2, pfb, p1, k4, p1, pfb, k2, p2.
Row 93: P2, k2, p3, k4, p3, k2, p2.
Row 94: P2, k2, pfb, p2, cable over 4 sts, p2, pfb, k2, p2.

10.16.12

Page 3 - Column 3, under Left Saddle, the last sentence should read: "Work the saddle cable by repeating only Rows 1–6 of the left leaning large cable."

Page 5 - On the Left Front Cable and Right Front Cable charts, the cable crossings on Row 80 should be T3F and T3B.

03.27.13

Page 5 - On the Left Front Cable and Right Front Cable charts, rows 91 and 92 should be as wide as row 90. They read as follows:

Row 91 (WS): K2, p2, k2, p4, k2, p2, k2.
Row 92 (RS): P2, k2, pfb, pfb, k4, pfb, pfb, k2, p2.

01.02.15

The cable symbols T4B and T4F have been revised on the following charts. Previously upside down, they have been corrected so the purl dots are now on top, instead of at the bottom, of the symbol:

Page 5, Left Front Cable (LFC) and Right Front Cable (RFC) charts, row 120: 8 instances
Page 7, Right Cuff and Left Cuff charts, row 28: 8 instances

Bernhardt

VERSION CHANGE
05.28.09 Original version
03.30.10 Page 2 - Column 2, last paragraph, the second sentence should read: "Dec 1 st at neck edge at beg of next 3 WS rows."
01.06.12 Page 3 - The header for the middle column, third paragraph should read: "Sizes (44 ¾, 47 ¼, 51 ¼, 53 ¼, 57 ½)" / (113.5, 120, 130, 136.5, 146) cm ONLY:" The first two sizes were removed.


Azami

VERSION CHANGE
03.29.10 Original version
06.16.11

Page 5 - On the chart, stitch 3 on row 3 in the blue shaded section should be "knit through back loop" (a crossed loop), not a "knit".

To the right in the written directions, rnd 3 now begins, "Rnd 3: K2, k1tbl, (k2tog..."


Inkberry

VERSION CHANGE
11.14.10 Original version
07.06.11

Page 3 - On page 3, column 2, Row 154 instructions should read:

Row 154: Sl 1 wyif, k2, sm, knit to center panel, sm, work Row 36 of Leaf Cable Pattern over 25 center sts, sm, knit to border marker, sm, k3.


Hawthorne

VERSION CHANGE
07.27.10 Original version
09.28.11

Page 2 - On row 21, the 4th stitch from the end (left side of the chart), not counting the grey "no stitches", should be a purl stitch (symbol with a black dot), not a knit stitch.


Pas de Valse

VERSION CHANGE
08.09.09 Original version
09.28.11

Page 2 - At the bottom of the right column, the last paragraph should read: "Beginning with 8th row including...." It was originally a 7th row.


Sweetstart

VERSION CHANGE
02.18.10 Original version
10.10.11 Page 2 - Wrap and turn (w&t) has been added to Abbreviations and is defined as: "Bring yarn to front of work between needles, slip next stitch to right needle, bring yarn around this stitch to back of work, slip stitch back to left needle, turn work to begin working back in the other direction."


Raina

VERSION CHANGE
03.28.11 Original version
04.28.12 Page 2, right column: Under "Work decreases as follows", two instances of "left shoulder" have been changed to "right shoulder", and two instances of "right shoulder have been changed to "left shoulder".


Delius

VERSION CHANGE
07.30.11 Original version
07.05.12

On page 1, right column, last paragraph and on page 2, middle column, paragraph 4, numbers have been revised for the last 3 sizes. The two paragraphs should now read:

"Rep Decrease row every RS row 8 (8, 4, 2, 4) times, then every 4th row 1 (1, 5, 9, 7) time(s)—29 (29, 30, 29, 30) sts rem."


Regent

VERSION CHANGE
04.09.12 Original version
10.15.12

Page 5, column 2: The first part of Rnd 25 has been changed to:
"* K3, kfb, k3, p3, pfb, p3; rep from...."


Timbali

VERSION CHANGE
11.13.11 Original version
01.08.13

Page 8 - Chart C has been redrawn:

There is no row 61 in Chart C.

Rows 62 and 64 are Wrong Side rows and the numbers have been moved to the left of the chart.

Row 63 (formerly row 61, the middle row) is a Right Side row and the number has been moved to the right of the chart.


Luggala

VERSION CHANGE
11.05.12 Original version
01.10.13

Page 1 - In the left column under Finished Measurements, the sample size shown should be "34 ½" / 87.5 cm".


Fortune Bay

VERSION CHANGE
08.06.12 Original version
01.15.13

Page 2 - In the left sidebar under "Shadow Wrap, worked knitwise (swk)", at the end of the first line the word "stitch" was misspelled.

Page 2 - In the left sidebar, directly above "Shadow Wrap, worked knitwise (swk)" and below "Rep Rows 1-4 for pattern", a new paragraph has been inserted:

Working Shadow Wraps: When working the Shadow Wraps either knitwise or purlwise, the doubled stitch is on the left hand needle after the worked is turned. This doubled stitch will be slipped at the beginning of the following row.

Page 3 - Under "Increasing short row wedge", the end of the set up row (after the turn) should read, "Sl 1, p2 (2, 2, 3, 3, 3, 3), swp, turn.


Lindis

VERSION CHANGE
04.08.13 Original version
06.11.13

Page 4 - In the left column of the chart key, the definition for the 5th symbol from the top (box with a right leaning slash) should be "ssp on RS, ssk on WS".

Page 7 - The chart at the top of the page should be labeled "Right Back Chart".

Page 9 - The chart at the top of the page should be labeled "Left Front Chart".

03.04.14

Page 7 - On both Back Charts, the 4-stitch decrease cable symbols on rows 21, 23 and 25 have changed. Where previously there were 2 purl dots, there is now 1. There are 4 such cable symbols on each chart.

Page 10 - On both Back Charts, the 4-stitch decrease cable symbols on rows 23, 25, 27, and 29 have changed. Where previously there were 2 purl dots, there is now 1. There are 4 such cable symbols on each chart.

Page 4 - In the right column of the chart key, the 7th and 8th symbols from the top have been redrawn from 3 stitches to 4 stitches wide, to match the symbols in the Back Charts above.

Carnica

VERSION CHANGE
04.11.14 Original version
04.30.14

Page 2 - In the right column, the 13th line from the bottom should read: "Rep Rows 49 and 50 six more times. 1 st..."

Isen

VERSION CHANGE
11.17.13 Original version
07.15.14

Page 1 - In the middle column, the 4th line should read: "Work Rows 1–34 of Chart A. The chart..."

Fluence

VERSION CHANGE
07.28.14 Original version
08.04.14

Page 1 - In the right column at the bottom, the section "Shape shawl with short rows" has been revised and a Note has been added:

NOTE: The lace pattern in the body of the shawl is incorporated into the short rows. Odd-numbered (RS) short rows begin with a yarn over. When you encounter that yarn over at the end of the following (WS) short row, it will be connected to the wrap around the next st. Purl the yarn over, remove the marker, then purl the wrap together with the wrapped st and proceed.

Row 4 (WS): Does not change.
Row 5: Yo, k2, k2tog, pm, w&t.
Row 6: Purl to marker, remove marker,  purl wrap together with st, p6, pm, w&t.
Row 7: Yo, k5, k2tog, * yo, k5, k2tog; rep from * to marker, remove marker, yo, knit wrap together with st, k4, k2tog, pm, w&t.

Farthingale

VERSION CHANGE
08.10.13 Original version
09.30.14

Page 1 - In the right column, the second-to-last paragraph now ends with "Break yarn. Slip next 20 (20, 20, 22, 24, 26) sts to right needle."

Also in the right column, the last paragraph with the heading "Divide for front and back" now begins with "Rejoin yarn."

Leadlight

VERSION CHANGE
11.18.14

Original version

12.04.14

Page 1 - In the left column under "Gauge", the gauge for Yoke Chart B has been changed to 32 sts and 32 rows.

Page 2 - On the schematic, the neck opening circumference has been changed to "17 ¼ (19 ½, 21 ¾, 24, 26 ¼, 28 ½)" / 44 (49.5, 55, 61, 66.5, 72.5) cm". Additionally, the gray dotted line has been changed to a solid black line to properly represent the front edges after the steeks have been cut.

12.17.14

Page 1: In the right column, Short Row 1 now indicates working in pattern (knit the knit sts and purl the purl sts).

Page 4: In the left column, after changing to smaller needles, the 2nd instance of next round now reads:

Next rnd: K0 (2, 0, 0, 2, 0), p1, k1 (3, 0, 1, 3, 0), p0 (1, 0, 0, 1, 0), work Hem Chart to last 1 (6, 0, 1, 6, 0) st(s), p0 (1, 0, 0, 1, 0), k1 (3, 0, 1, 3, 0), p0 (1, 0, 0, 1, 0), k0 (1, 0, 0, 1, 0).

Page 5: On Yoke Chart C, round 1, the increase cable symbols have been recolored to show MC sts crossing over CC1 sts.

12.29.14

Pages 5 and 6: On Yoke Chart C, round 7, and on Hem Chart, row 1, the cables have been flipped. They are now “Sl 3 sts to cn and hold to back, k2, sl last st from cn to left needle and k1, then k2 from cn.” (The cables cross right over left.)

01.08.15

Page 4: The definition for Right Lifted Increase should read: Knit into the front loop of the st below the next st on left needle, then knit the next st on left needle.

Page 6: On Cable Charts A and B, round 25 has been deleted. There is now a purl stitch at stitch 4 on all rounds except the cable rounds (1, 5, and 21). On Cable Chart A, the cable crossing at round 22 has been moved down to round 21.

Page 6: On the Hem Chart, the following has been added to the Note after the title: "Sizes 31 and 43" / 78.5 and 109 cm  sleeves ONLY: There are not enough sts to work the cable crosses at the beginning and end of Rnd 7; work sts 7, 8, 39, and 40 of Rnd 7 as knit sts."

Jaali

VERSION CHANGE
080108 Original version
112108

Page 1-
Waist shaping:
Next row (RS): P1, ssp, p to last 3 sts, p2tog, p2.

Chart C:
Row 5 a cable is missing at the end of the row.

Chart E
Row 2 is missing a purl, 5th stitch from the right.