Subscribe



Receive HTML?

Sapwood

VERSION CHANGE
08.06.12 Original version
10.31.12

Page 1 - In the middle column, the 12 line from the top should read: "... measures 2 ½" / 6.5 cm from CO edge, ending ..."

Page 2 - In the middle column, the 4th line from the top should read: "... st on sides until piece measures 2 ½" / 6.5 cm, ..."


Chione

VERSION CHANGE
11.09.12 Original version
11.29.12

Page 1 - Under Body, Front Neck shaping decreases have been revised.

Page 2 - Under Back, the Back Neck shaping stitch count has been revised.

Page 6 - On Chart A, row 93 has been revised.

Page 6 - Charts B and C now begin with what was formerly row 3 and end with what was formerly row 2.

Page 7 - Under Left Sleeve, shaping just before the Sleeve Cap has been revised.

Page 8 - On Chart F, row 15 has been revised.


Merise

VERSION CHANGE
04.05.13 Original version
04.23.13

Page 1 - Under Yarn, the yarn brand name was corrected to "Austermann", with 2 "n"s.

Lempicka

VERSION CHANGE
10.04.13 Original version
10.15.13

Page 1 - In the center column, the 10th line from the bottom should begin: "M1R, sm, k2, sm, M1L, purl to marker..."

Wonderland

VERSION CHANGE
11.18.13 Wonderland features 5 winter accessories to knit. The following pattern has been updated:
 

Prototype - current version 02.14.14

Safra

VERSION CHANGE
07.28.14 Original version
08.04.14

The body of the Crescent shawl is knit in garter stitch, not Stockinette stitch. The following lines have been revised:

Page 1 - In the middle column under "Work short rows", row 2 (WS) now reads: "K5, pm, knit to last 5 sts, w&t."

Page 1 - In the middle column under "Work short rows", row 4 now reads: "K5, pm, knit to next marker, remove marker, w&t."

Page 1 - In the right column, the first line now reads: "Next WS row: Knit to end of row, removing marker and knitting wraps together with wrapped stitches."

Leadlight

VERSION CHANGE
11.18.14

Original version

12.04.14

Page 1 - In the left column under "Gauge", the gauge for Yoke Chart B has been changed to 32 sts and 32 rows.

Page 2 - On the schematic, the neck opening circumference has been changed to "17 ¼ (19 ½, 21 ¾, 24, 26 ¼, 28 ½)" / 44 (49.5, 55, 61, 66.5, 72.5) cm". Additionally, the gray dotted line has been changed to a solid black line to properly represent the front edges after the steeks have been cut.

12.17.14

Page 1: In the right column, Short Row 1 now indicates working in pattern (knit the knit sts and purl the purl sts).

Page 4: In the left column, after changing to smaller needles, the 2nd instance of next round now reads:

Next rnd: K0 (2, 0, 0, 2, 0), p1, k1 (3, 0, 1, 3, 0), p0 (1, 0, 0, 1, 0), work Hem Chart to last 1 (6, 0, 1, 6, 0) st(s), p0 (1, 0, 0, 1, 0), k1 (3, 0, 1, 3, 0), p0 (1, 0, 0, 1, 0), k0 (1, 0, 0, 1, 0).

Page 5: On Yoke Chart C, round 1, the increase cable symbols have been recolored to show MC sts crossing over CC1 sts.

12.29.14

Pages 5 and 6: On Yoke Chart C, round 7, and on Hem Chart, row 1, the cables have been flipped. They are now “Sl 3 sts to cn and hold to back, k2, sl last st from cn to left needle and k1, then k2 from cn.” (The cables cross right over left.)

01.08.15

Page 4: The definition for Right Lifted Increase should read: Knit into the front loop of the st below the next st on left needle, then knit the next st on left needle.

Page 6: On Cable Charts A and B, round 25 has been deleted. There is now a purl stitch at stitch 4 on all rounds except the cable rounds (1, 5, and 21). On Cable Chart A, the cable crossing at round 22 has been moved down to round 21.

Page 6: On the Hem Chart, the following has been added to the Note after the title: "Sizes 31 and 43" / 78.5 and 109 cm  sleeves ONLY: There are not enough sts to work the cable crosses at the beginning and end of Rnd 7; work sts 7, 8, 39, and 40 of Rnd 7 as knit sts."

Minthe

VERSION CHANGE
04.20.15 Original version
04.24.15

Page 2 - In the left column, 2nd paragraph, the third line from the bottom now reads: "...pm B (pocket marker), p20, pm A (shaping..."

04.28.15

Page 2 - In the left column, 2nd paragraph, the last 4 lines now read: "...p26 (30, 32, 36, 40, 46, 52, 60, 66), pm B (pocket marker), p20, pm A (shaping marker), purl to end. Place locking st markers in body band in same location as B markers." The "p20" before "pm B (pocket marker)" has been removed.

Alodia

VERSION CHANGE
08.02.15 Original version
08.21.15

Page 4 - On Chart A, row 6, st 14 should be k1 tbl, not p1.

Sceptre

VERSION CHANGE
11.15.15 Original version
12.08.15

Page 1 - In the middle column under "Begin working from Chart A", it now begins, "Work Rows 1–14 of Chart A..."

Charts A (page 3), B (page 4), and D (page 5) are worked back and forth in rows, not rounds. All odd numbers (and odd-numbered rows) stay on the right side of the charts. All even numbers (and even-numbered rows) have been moved to the left side of the charts.

Linden

VERSION CHANGE
08.01.08 Original version
09.17.08 Corrected errors with stitch numbers/decreases in triangle points in right and left fronts.

Corrected right front stitch counts between decreases.
09.22.08 Corrected direction of decreases on right front.

Kingscot

VERSION CHANGE
11.11.08 Original version
11.26.08 2 cables corrected in Row 61 of the Front Charts
03.30.10

Page 4 - Column 1, the instructions for the buttonhole rows should read as follows:

Buttonhole row (RS): K2, p1, k1tbl, BO 2, p1, k1tbl, p1, k2.
Next row (WS): P2, k1tbl, p1, k1 tbl, CO 2, p1, k1tbl, p2.

Page 4 is now page 9 in this version.

05.28.10

Page 4 - In the key, right column, the 3rd symbol should read: "Sl 2 sts to CN and hold to back, k2, k2 from CN" and the 4th symbol should read: "Sl 2 sts to CN and hold to front, k2, k2 from CN".


Arrow of Apollo

VERSION CHANGE
05.28.09 Original version
06.23.09 Page 3 - Column 2, round 5 omits the "ssk" and should read "Rnd 5: Knit to instep sts, C2B (C4B, C4B), p0 (0, 2), work next Row of Diamond Chart pattern, p0 (0, 2), C2F (C4F, C4F), knit to end of rnd."

Sabbatical

VERSION CHANGE
12.02.09 Original version
01.07.10

Page 5 - Chart B, row 5. Stitch 34 should be "k" (knit) and stitch 36 should be "k2tog".


Maire

VERSION CHANGE
09.15.09 Original version
01.07.10

There are missing stitches in the Sleeve instructions. On page 3, paragraph 3, beginning with line 3, it should read:

Next rnd: P7 (8, 8, 9, 10), k2, p2 (2, 3, 3, 3) work Row 1 of Chart 2 over the next 11 sts, p2 (2, 3, 3, 3), k2, p7 (8, 8, 9, 10). 37 (39, 41, 43, 45) sts.

01.12.10

Page 5 - Chart 1, row 18, stitches 2, 3, 9 and 10 should be knit instead of purl.


Passiflora

VERSION CHANGE
03.29.10 Original version
04.27.10

Page 3 - Written instructions for the Lace Motif have been revised. The Side and Front Charts have been revised.
Page 4 - The Back Center Chart has been revised and shows both RS and WS rows.


Coventry

VERSION CHANGE
07.27.10 Original version
08.23.10 Page 1 - The yarn requirements are now "4 (4, 4, 5, 6) skeins Miss Babs Yowza...."
12.20.10 Page 4 - M1P has been added to Abbreviations on the right side of the page and should be defined as: "Make 1 Purl: Insert left needle, from front to back, under strand of yarn which runs between next stitch on left needle and last stitch on right needle; purl this stitch through back loop. 1 stitch increased."


Greenaway

VERSION CHANGE
11.08.10 Original version
12.20.10

Page 2 - The sleeve schematic has been changed slightly:

The sleeve length measuring from the underarm should extend down to the cast on edge, not to the end of the cuff.

The cuff measurements on the right side has been changed to 3" / 7.5 cm for all sizes.


Sunbreak

VERSION CHANGE
03.28.11 Original version
04.06.11

Page 5 - The chart has been revised to reflect a sunburst in knit stitches on a background of purl stitches. Furthermore, a new twisted stitch symbol defined as "purl through back loop on RS, knit through back loop on WS" has been added. This replaces the twisted stitch symbol that was on the left side of the chart and the right side of each sunburst flare.

04.18.11

Page 5 - The chart has had a minor revision. Ssk has been added so that row 43 now reads: P15, yo, k1, ssk, yob, k1, ssk, p24.

05.25.11

Page 4 - Under Sides, left column, 2 rows have been rewritten so that the rib pattern is maintained.

Row 1 (RS): K2, [p2, k2] 4 times, sl next 8 sts to cn and hold to front of work, [p2, k2] twice, then [p2, k2] twice from cn.

Row 11: K2, sl next 8 sts to cn and hold to back of work, [p2, k2] twice, then [p2, k2] from cn, [p2, k2] 4 times.


Boundless

VERSION CHANGE
07.30.11 Original version
10.10.11

Page 4 - Row 25 of the Body Chart has been revised to include 2 additional sts. At the beginning, the first 4 stitches should be: "K3, p1, k1, left lifted increase...." At the end, the last the last 6 stitches should be: "....right lifted increase, k1, p1, k3."

11.03.11

Page 1 - In the left column under Gauge, the second gauge should read: "17 sts and 17 rows = 4" / 10 cm worked in slipped rib pattern (Rows 76–77 of Body Chart)."


Zosia

VERSION CHANGE
11.13.11 Original version
12.12.11

Page 1 - Under Gauge in the left column, the second gauge should now read: "24 sts and 21 rows = 4" / 10 cm in Cable Motif on larger needles after blocking".

12.22.11

Page 1 - Middle column, under Body: In the Dec to Waist section, RS and WS decreases have been switched as follows:

"RS Dec rows are worked as follows: * Work in est pattern to 2 sts before marker, ssp, work to next marker, p2tog...."

"WS Dec rows are worked as follows: *Work in est pattern to 2 sts before marker, k2tog, work to next marker, ssk...."

01.06.12

Page 5 - Under Sleeves, Row 1 (WS) now reads: "K3, p2, *k4, p4; rep from * to last 9 sts, k4, p2, k3."