Subscribe



Receive HTML?

Carajillo

VERSION CHANGE
04.21.15 Original version
06.03.15

Page 3 - On Chart B, row 8, st 2 from the left has been changed from “yarn over” (square with a circle) to “k2tog on WS” (square with a filled-in circle and a slash).

07.01.15

Charts B and C are now on their own pages and slightly larger. Chart B is now on page 3, Chart C on page 4, and Chart D on page 5. The Abbreviations and bio are on page 6.

Page 4 - Chart C: On rows 1, 5, 9, 13, 17, 21, 25, and 29, st 1 from the right should be "ssk on WS" (square with a filled-in circle and left-leaning slash), not "knit on WS" (square with a filled-in circle).

On row 2, st 17 from the left should be "k2tog" (square with a right-leaning slash) not "ssk" (square with a left-leaning slash).

On row 5, st 25 from the left should be "knit on WS" (square with a filled-in circle) not "knit on RS" (empty square).

On row 7, st 21 from the left should be "knit on WS" (square with a filled-in circle) not "knit on RS" (empty square).

Page 5 - Chart D: On rows 1, 5, 9, 13, 17, 21, 25, 29, 33, 37, 41, 45, 49, 53, 57, 61, 65, 69, 73, and 77, st 1 from the right should be "ssk on WS" (square with a filled-in circle and left-leaning slash), not "knit on WS" (square with a filled-in circle).

Feileacan

VERSION CHANGE
08.02.15 Original version
02.01.16

Page 2 - In the left column under Separate thumb, the Next rnd of Left Mitten now reads: “Work in Moss st for 25 sts, place next 19 sts onto holder or waste yarn, CO 7 sts, work Rnd 1 of Hand Chart to end.”

Page 3 - In the symbol key, the 4th symbol from the bottom (on v.08.02.15), which is a left-leaning 3-stitch twisted stitch cable, has been removed. The definition for this symbol is “Sl 1 st to cn and hold to front, k1 tbl, p1, k1 tbl from cn.”

Page 5 - The Left Mitten Chart is affected by the deletion of the cable above. All instances of this cable have been replaced by a right-leaning 3-stitch twist stitch cable which, on the symbol key on page 3, is the 5th symbol from the bottom (on v.08.02.15). Its definition is “Sl 2 sts to cn and hold to back, k1 tbl, (p1, k1 tbl) from cn."

12.06.16 On the Left Mitten Chart, some twisted cables that leaned left were corrected to lean right. A knit/purl twisted cable was changed to a knit/knit twisted cable.

Lovat

VERSION CHANGE
11.15.15 Original version
02.08.16

Page 3 - The following revisions apply to the left column:

The first Next row (RS) has now been changed to Next row—End Purl Column row (RS). The directions remain the same.

In the second Next row (RS), the 4th line now begins, "...be ended, skp, k2 across column] twice..."

The following paragraph has been inserted just before the paragraph beginning with "AT THE SAME TIME": "Continue working End Purl Column row every RS row until all purl columns are closed (some purl columns will have more than 3 sts, knit all the purl sts to close the column)."

04.11.16

Page 7 - In the left column under Shape band using short rows, Short row 8 has changed. It now begins: "Work 10 sts, k2tog..."

Unnathi

VERSION CHANGE
04.08.16 Original version
04.26.16

Page 1 - In the right column just before I-cord Bind-Off, the third Next row—Dec row now reads: "K2, [p1 tbl, k1] twice, p3tog, * [k1, p1 tbl] 3 times, k1, p3tog; rep from * to last 6 sts, [k1, p1 tbl] twice, k2. 181 (213) sts rem."

Smarty

VERSION CHANGE
07.28.14 Original version
07.01.16

Page 6 - In the right column, the instructions for rows 2 and 4 have changed slightly. They now begin: "With CC2/CC1, * knit to 1 st before neck marker..."

Rumford

VERSION CHANGE
08.08.16 Original version
10.31.16

Page 1 - The suggested yarn spec has been changed: 6 (7, 7, 8, 9, 9, 10) hanks Green Mountain Spinnery Capricorn (112 yd / 102 m per 3 ½ oz / 100 g hank; 65% Fine Wool, 35% Mature Mohair) in #8189 Grey

Arise

VERSION CHANGE
12.12.16 Original version
02.07.17

Page 1 - In the middle column of the directions, the Note has been changed to read: "Each 18-row repeat of Chart B adds one additional 18-st pattern repeat."

Page 2 - On Chart B, the pattern repeat has been extended to included the 2 left columns of purl stitches. The pattern repeat is now 18 stitches wide, instead of 16.

Jaali

VERSION CHANGE
080108 Original version
112108

Page 1-
Waist shaping:
Next row (RS): P1, ssp, p to last 3 sts, p2tog, p2.

Chart C:
Row 5 a cable is missing at the end of the row.

Chart E
Row 2 is missing a purl, 5th stitch from the right.

Postwar Mittens

VERSION CHANGE
110608Original version

 011009

Notes for knitting specific thumb patterns are located next to the respective thumb charts.

For the Star thumb pattern, charts are located on page 7.

On page 9, labels for the Lozenge thumb charts have been fixed. The Lozenge thumb back charts were corrected to fix a color error.

Roo

VERSION CHANGE
06.29.09 Original version
07.23.09 Page 2 - Under Sleeves, Rows 1-3 should read "K 2 (3, 4, 5, 6), place marker...."

Page 3 - Column 2, second paragraph should read "Work inc row every 6th (8th, 8th, 8th, 8th) row 3 (3, 3, 3, 3) more times, working St st only when row 17 of Sleeve Chart is complete—37 (39, 41, 42, 45) sts."

Page 7 - In the chart key, the definition for the knit symbol should read "k on the RS, p on the WS" and the definition for the purl symbol should read "p on the RS, k on the WS".
08.06.09 This update corrects an error in the previous version.

Page 3 - Column 2, second paragraph should read "Work inc row every 6th (8th, 8th, 8th, 8th) row 3 (3, 3, 3, 3) more times, working St st only when row 17 of Sleeve Chart is complete—37 (39, 41, 43, 45) sts."

Luke's Diced Vest

VERSION CHANGE
02.21.09 Original version
08.06.09 Page 1 - The last paragraph in the middle column going into the last column should read "Work Chart A 3 times, continuing to
work steek sts in dark and light yarns as set, then work rnds 1 (1-15, 1-15, 1-15, 1-15, 1-15) once more."

Twin Oaks

VERSION CHANGE
06.08.10 Original version
06.25.10

Page 1 - A note has been added about yarn over short rows.

Page 2 - Additional instructions have been added on how to work certain stitches on the wrong side.

Pages 2 and 5 - All instances of the symbol "w&t" have been replaced by "yarn over tightly".

07.23.10 Page 2 - Chart key, middle column. A new cable symbol has been inserted between the second and third, and is a reverse of the third symbol. This new symbol is defined as: "Sl first st to CN and hold to front; sl second st to another CN and hold to front; k1, p second st, k first st."


Twinflower

VERSION CHANGE
07.28.10 Original version
09.22.10

Page 3 - Under Sleeves in the second column, the last sentence of the third paragraph should read: "You have knit a turning ridge, joined the sleeve pieces together, and worked Row 1 of the Lace Chart."

Page 4 - In the chart key, the defintion for the 4th symbol (twisted stitch with a filled-in loop) should read: "WS: purl through back loop".


Cottage Garden

VERSION CHANGE
08.13.09 Original version
11.17.10

Page 4 - On the chart, some decreases have been moved:

On rows 14 and 21, the k2tog symbols have been removed; all stitches are knit.

On row 15, there is a k2tog at the second stitch and the last stitch (both stitches are CC). On row 22, there is a k2tog at the first stitch (CC) and the second to the last st (MC).


Halliard

VERSION CHANGE
02.08.11 Original version
03.02.11

Pdf was optimized for faster viewing.

03.15.11

Page 3 - Two 5-st cable symbols have been added to the chart key. These symbols are used only on the Underarm Chart on page 5.

Page 5 - The first and last cable symbols on rows 2, 4, 6, 8, and 10 have been updated with the new 5-st cable symbols.

It should be noted that this is a chart update only. Halliard can be knit as is using previous pdf versions.


Vesna

VERSION CHANGE
03.28.11 Original version
05.02.11

Page 1 - Under Crescent in the right column, a marker has been added to row 1. It now reads:

Row 1 (RS): K6, yo, cdd, yo, k6, [pm, k7, yo, cdd, yo, k6] 3 times, pm, k7, yo, cdd, yo, k7, [pm, k6, yo, cdd, yo, k7] 3 times, pm, end k6, yo, cdd, yo, k6.

07.06.11

Page 4 - On row 29 of the chart, the note now reads "Change to size 9 US / 5.5 mm needle."


Sweetstart

VERSION CHANGE
02.18.10 Original version
10.10.11 Page 2 - Wrap and turn (w&t) has been added to Abbreviations and is defined as: "Bring yarn to front of work between needles, slip next stitch to right needle, bring yarn around this stitch to back of work, slip stitch back to left needle, turn work to begin working back in the other direction."


Asher

VERSION CHANGE
07.30.11 Original version
01.09.12

Page 2 - In the left column under Setup of Garter Stitch Grafting, Step 4 should read: "Bring yarn purlwise through next stitch
on front needle, leaving the stitch in place." 3, p1, k1, left lifted increase...." At the end, the last the last 6 stitches should be: "....right lifted increase, k1, p1, k3."

Page 2 - In the right column just before Begin Slipped Rib pattern and right after "...WS facing for next row", there should be a line that reads: "Change to larger needles."


Paisley

VERSION CHANGE
04.12.12 Original version
09.10.12

Page 2: In the right column, the fifth paragraph should begin with: Next row (RS): K1, k2tog, k1, Rlinc, knit to last 4 sts, Llinc, k1, ssk, k1."


Kyllene

VERSION CHANGE
11.12.11 Original version
01.10.13

Page 4 - The sleeve chart has been redrawn to include 3 edge stitches and to realign the pattern for all 9 sizes.


Luggala

VERSION CHANGE
11.05.12 Original version
01.10.13

Page 1 - In the left column under Finished Measurements, the sample size shown should be "34 ½" / 87.5 cm".