Subscribe



Receive HTML?

Bonspiel

VERSION CHANGE
11.13.15 Original version
01.22.16

Page 2 - In the left column under Shape Shoulders using short rows, all 8 lines of "Next row" have been replaced with the following:

Next row (RS): Work to end, picking up wraps and purling them tog with wrapped sts as you come to them.
Next row (WS): K14 (16, 16, 16, 19, 18, 19, 19), BO center 30 (30, 32, 34, 34, 38, 40, 42) sts for Back neck, knit to end, picking up wraps and knitting them tog with wrapped sts as you come to them.

01.29.16

Page 3 - In the left column under Shape Armhole, the row after Next row (WS) now reads: "Next row (RS): Work in pattern to end."

Page 3 - In the middle column under Left Front, Row 1 now reads: "* K2, p2; rep from * to last st, p1."

Page 3 - In the right column under Begin working from Chart, the Set-up row (RS) now begins: "K2, p2, k2..."

02.04.16

Page 4 - In the middle column under Begin working from Chart, a Wrong Side row has been added after Set-up row (RS). It reads: "Next row (WS): Knit the knit sts and purl the purl sts as they appear."

Bosquet

VERSION CHANGE
04.08.16 Original version
04.25.16

Page 1 - In the middle column under 1-Panel Stole, row 5 now reads: "Sl 1, k1, kfb, k1, kfb, k2. 9 sts."

Wisteria

VERSION CHANGE
08.01.08 Original version
08.02.08 Yarn yardage and weight corrected. It now reads: Lorna’s Laces Green Line Worsted (100% extra fine merino wool; 210 yd / 192 m per 4 oz skein) in Dusk
08.05.08 Page 3 - M1R should be knit through the front loop.

Page 4 - Row 11 of the Collar and Yoke Chart should read: "...move m 3 sts to the left" and Row 19 should read: "...move m 2 sts to the right".
09.24.15 Page 5 - On Row 42 of the Bottom Chart, the cable crosses have changed from knit-over-knit to knit-over-purl. Row 42 now reads: * Slip 2 sts to CN and hold to front, p1, k2 from CN; p4; s1 1 st to CN and hold to back, k2, p1 from CN; repeat from * once more.
02.15.16 Page 8 - On row 33, the first 4 sts are now a right-leaning 4-stitch cable cross. In the key on page 4, it is the 3rd symbol from the bottom in the right column, with the definition "S1 2 sts to CN and hold to back, k2, k2 from CN".

Sylvi

VERSION CHANGE
111208 Original version
122308 Updates made to back and hood charts, clarifications made to text.
05.14.12 Page 6: On row 19, the cable at sts 61-66 has been changed from c6b to c6f.


Necco Wafer

VERSION CHANGE
02.21.09 Original version
03.25.09 On the Striped V-neck Inset Chart, the middle set of sizes starting at row 5 should be 6 mos, 12 mos, and 18 mos.

Sundog

VERSION CHANGE
05.28.09 Original version
06.23.09 Page 2 - Column 1, paragraph 1, first sentence should read "With dpns and CC, loosely CO 56 (56, 56, 56, 56, 64, 64, 72) sts, join and work 2 repeats of Seed Stitch (see Stitch Guide)."
05.28.09 Original version
10.31.12 Page 4 - Under Abbreviations, the description of M1R (Make 1 Right) should end with "... through front loop. 1 stitch increased."


Anney

VERSION CHANGE
03.29.10 Original version
06.18.10

Page 4 - On the Chart, all instances of p2togtbl on row 83 have been changed so they match the key on page 6.

Page 5 - On the Left Leaf Chart, rows 6 and 8 have an additional stitch added to the beginning of the rows. On the Right Leaf Chart, rows 6 and 8 have an additional stitch added to the end of the rows. For both charts, row 6 now reads as "knit 4" and row 8 as "knit 3".


Audrey in Unst

VERSION CHANGE
08.09.09 Original version
06.24.10 Page 3 - Under Shape Neck for the Left Front, row 31 should read: "Knit to first group of lace, (k3, yo) 7 times, k1, turn work."
07.15.10 Page 3 - Under Abbreviations, the definition for rev St st is now "reverse Stockinette stitch: p on the RS, k on the WS".


Crown of Leaves

VERSION CHANGE
07.27.10 Original version
09.13.10 Page 2 - The cable symbols in the last column of the chart key have been revised. From the top, they are: C2B, C4B, C4F.


Mod Podge

VERSION CHANGE
11.14.10 Original version
03.15.11

Stitch counts for the Back, Back Armholes, and Left Front have been revised.


Ormond

VERSION CHANGE
03.25.11 Original version
04.19.11 Page 2 - In the symbol key, the purl symbol is now defined as "p on RS, k on WS".
04.11.16

Page 2 - In the right column, the last paragraph under Back and just before Right Front now reads: "Place 20 (20, 21, 21, 21, 22, 22, 23, 23, 23) sts on a holder for Right Shoulder; BO 46 (48, 50, 52, 52, 52, 54, 54, 54, 56) sts for Back Neck; and place 20 (20, 21, 21, 21, 22, 22, 23, 23, 23) sts on a second holder for Left Shoulder."

Page 3 - In the middle column under Left Front, the last paragraph beginning with "Next row (RS):" has been replaced with the following: "Rep Neck edge dec row every 6th row 0 (0, 1, 5, 5, 4, 8, 7, 7, 10) time(s), then every 8th row 5 (6, 6, 3, 3, 4, 1, 2, 2, 0) time(s), end with RS row."

Page 3 - In the right column, the first 3 paragraphs before "Shape shoulder" have been replaced with the following 2 paragraphs:

"AT THE SAME TIME, BO 2 (3, 4, 4, 5, 5, 5, 5, 6, 6) sts at beg of next RS row, then BO 2 (2, 2, 3, 3, 4, 4, 4, 4, 5) sts at beg of next RS row, and then BO 0 (2, 2, 2, 2, 3, 3, 3, 3, 3) sts at beg of next RS row.

Dec 1 st at armhole edge every RS row 0 (0, 0, 2, 4, 4, 6, 8, 11, 11) times. 38 (38, 39, 39, 39, 40, 40, 41, 41, 41) sts."

Sweetheart

VERSION CHANGE
02.18.10 Original version
10.10.11 Page 2 - Wrap and turn (w&t) has been added to Abbreviations and is defined as: "Bring yarn to front of work between needles, slip next stitch to right needle, bring yarn around this stitch to back of work, slip stitch back to left needle, turn work to begin working back in the other direction."


Litchfield

VERSION CHANGE
07.30.11 Original version
11.18.11

Page 4 - An abbreviation has been added: "w&t: wrap and turn. Bring yarn to front of work between needles, slip next stitch to right needle, bring yarn around this stitch to back of work, slip stitch back to left needle, turn work to begin working back in the other direction."

Page 8 - The Hatband Chart is worked in rows, not rounds. Therefore, the right side of the chart should be odd-numbered rows 1–53 and the left side of the chart should be even-numbered rows 2–54.


Finial

VERSION CHANGE
11.12.11 Original version
02.20.12

Page 3 - On rows 4 and 10 of the chart, a vertical line separating C5F and the next stitch has been added. The 5-stitch cable C5F should now be followed by a separate knit stitch.


Laresca

VERSION CHANGE
04.08.12 Original version
08.20.12

Page 3: In the left column, the beginning of the fifth paragraph has been revised. It should read:

Row 2 and all WS rows: K3, purl to second marker, sm, p1, k3; on other side, k3, p1, sm, purl to last 3 sts, k3.


Celestarium

VERSION CHANGE
11.02.12 Original version
01.03.13

Page 5 - On Chart E1, stitch numbers 1–72 have been added below the chart grid. The numbers begin with 1 on the right side and end with 72 on the left side.

03.01.13

Page 2 - On the Shawl Overview, the seventh star of Eridanus (bottom right) has been added. The corresponding chart has not been changed.

The following changes do not affect the shawl's design; all changes concern moving the chart row count up so it matches up with the written directions after Rounds 1 and 2.

Page 3 - Chart A is now Rounds 3–6. On page 1, the first increase row is now Round 7, not 6.

Page 3 - Chart B is now Rounds 8–13. On page 1, the second increase row is now Round 14, not 13.

Page 3 - Chart C is now Rounds 15–26. On page 1, the third increase row is now Round 27, not 26.

Page 4 - Charts D1 and D2 are now Rounds 28–51. On page 1, the fourth increase round is now Round 52, not 51.

Pages 5–8 - Charts E1–E4 are now Rounds 53–100. On page 1, the last increase round is now Round 101, not 100.

Pages 9–16 - Charts F1–F8 are now Rounds 102–156. On page 1, the last two knit rounds are now Rounds 157 and 158, not 156 and 157.

03.06.13

Page 3 - A page showing constellation placement has been added. This is simply an imposition of the shawl overview on the chart overview.

The following changes do not affect the shawl's design; an incremental bead shift does not change a constellation's overall placement.

Page 6 (page 5 if not v.03.01.13) - On Chart E1, the "star" (coordinate is by bead position) at row 83, stitch 54 has been moved to row 79, stitch 62. The star at row 78, stitch 57 has been moved to row 88, stitch 66.

Page 14 (page 13 if not v.03.01.13) - On Chart F5, the star at row 142, stitch 290 has been moved to row 152, stitch 290.

Pixel

VERSION CHANGE
08.06.12 Original version
01.03.13

The following chart revisions ensure that a previous row's color does not show up in the purl stitches of the next row.

Pages 2–4 - For all sizes of the Mittens Chart, in rows 1 and 5 all instances of "purl in CC1" have been changed to "knit in CC1".

Page 6 - For the Hat Chart, in rows 1 and 5 all instances of "purl in CC1" have been changed to "knit in CC1".

For the Earflap Chart, in rows 1, 5, 9, 13, 17 and 21 all instances of "purl in CC1" have been changed to "knit in CC1".


Lyssia

VERSION CHANGE
04.05.13 Original version
06.01.13

Page 1 - In the right column, the third paragraph from the bottom should begin: "Starting on the 7th (7th, 7th, 7th, 7th, 7th, 7th, 7th, 3rd, 3rd) row after the border....".

Underwing

VERSION CHANGE
08.11.13 Original version
10.31.13

Page 1 - In the center column under Thumb Gussets, the following 2 rows should read:

Rnd 15: Work next rnd of Chart to marker, sm, * k1 MC, k1 CC; rep from * to last st, k1 MC.
Rnd 16: Work next rnd of Chart to marker, sm, m1 CC, * k1 MC, k1 CC; rep from * to last st, k1 MC, m1 CC.

Page 3 - In the left column, the last 2 rnds should read:

Next rnd: Using CC, ssk to end—13 sts.
Next rnd: Using CC, ssk to last st, remove marker, ssk (last st with first st of next rnd)— 6 sts.

Joist

VERSION CHANGE
11.23.13 Original version. Joist is also featured in the combined pattern beginning on page 2. The first page number refers to the single pattern; the second page number after the slash (/) refers to the combined pattern.
02.14.14

Page 5/6 - In the Chart, Sleeve size 48" / 122 cm now begins and ends at the same time as Body size 51 ¼" / 130 cm. They have been combined into one bracket (7th from the top) beginning at st 18 and ending at st 57.

Safra

VERSION CHANGE
07.28.14 Original version
08.04.14

The body of the Crescent shawl is knit in garter stitch, not Stockinette stitch. The following lines have been revised:

Page 1 - In the middle column under "Work short rows", row 2 (WS) now reads: "K5, pm, knit to last 5 sts, w&t."

Page 1 - In the middle column under "Work short rows", row 4 now reads: "K5, pm, knit to next marker, remove marker, w&t."

Page 1 - In the right column, the first line now reads: "Next WS row: Knit to end of row, removing marker and knitting wraps together with wrapped stitches."